Importance of Transient Studies in Large Electrical Systems
Importance of Transient Studies in Large Electrical Systems T . E . C . T Tackling Electrical Concerns of Today Written By : Mr. Sonjib Banerjee Edited By : Dr. Diksha Rohra Facebook | LinkedIn District Cooling Plant A District...
Insulation Co-ordination Study For Selection & Placement Of Surge Arresters
Insulation Co-ordination Study For Selection & Placement Of Surge Arrestors T . E . C . T Tackling Electrical Concerns of Today Written By : Mr. Sonjib Banerjee Edited By : Dr. Diksha Rohra Facebook | LinkedIn AIM OF STUDY...
Importance of Transient Study in Transmission Lines
Importance of Transient Study in Transmission Lines T . E . C . T Tackling Electrical Concerns of Today Written By : Mr. Sonjib Banerjee Edited By : Dr. Diksha Rohra Facebook | LinkedIn Problem Statement A coal-fired thermal power...
Importance of Protection Coordination in Power System for Safety and Reliability
Importance of Protection Coordination in Power Systems for Safety and Reliability A safe and reliable power system network can be achieved through steady state and transient analysis. The healthiness of the network during the operational condition, contingency condition and fault...
Electrical Safety and Reliability in Pharmaceutical Industry
Electrical Safety and Reliability in the Pharmaceutical Industry Leading pharmaceutical firms have the challenging goal of maintaining the highest production, innovation, and development levels while safeguarding the health and safety of their workforce, coworkers, and communities. The pharmaceutical industry...
Ensuring Reliable Access to Energy – Role of Root Cause Analysis
For a country to thrive, it is required to have reliable Infrastructure. In the new normal where pandemic has become an everyday reality that we need to face, the reliability of infrastructure has become even more crucial. Energy production, transmission...
Case Study: Root Cause Analysis for Cable Function Recovery Leads to Revenue Growth in Millions
Problem Statement: An electrical power distribution company laid an underground cable to transfer 40MW power from substation to a load centre which was few kilometres away. After charging the cable, the cable performed as intended for 4 hours and then...